Skip to main content

Installing the Egress Hatch Frame

16:37
32:05
17.3K views

At 16:37 in

Building A MASSIVE Deck Part 7 - Deck Hatch and Deck Ceiling Install

What happens here

The pre-assembled egress hatch frame is carefully maneuvered through the basement's egress window opening and positioned beneath the deck. The frame is secured to the underside of the existing deck joists using screws, ensuring it is perfectly aligned and flush with the surrounding deck surface. This precise installation is crucial for the hatch's seamless integration.

Goal: Secure the egress hatch frame beneath the deck.

Tools and materials

  • Cordless Drill/Driver DeWalt — Securing the frame with screws
  • Egress Hatch Frame — The structural base for the hatch door
  • Exterior Screws — Fastening the frame to the joists
  • Level — Ensuring the frame is installed perfectly level
  • Measuring Tape — Verifying dimensions and alignment