Skip to main content

Establish Deck Foundation and Framing

0:00
25:42
25.6K views

At 0:00 in

Building A MASSIVE Deck Part 3 - Roof Framing and Sheathing

What happens here

The project begins with an aerial view of the existing house and backyard, showing the initial stages of the deck construction. Concrete is poured for the base of the outdoor living area, followed by the framing of the deck structure itself. This foundational work sets the stage for the roof addition, ensuring a stable platform for the new overhead structure.

Goal: Prepare the deck and a stable base for the roof structure.

Tools and materials

  • Concrete Mixer Truck — Delivering and pouring concrete for the base
  • Cordless Drill/Driver Makita — Fastening deck components
  • Pressure-Treated Lumber — Constructing the deck joists and beams
  • Shovels/Rakes — Spreading and leveling concrete
  • Tape Measure — Measuring and marking lumber
  • Wheelbarrow Jackson — Transporting concrete from the truck to the pour site
  • Wooden Boards/Forms — Creating the concrete forms for the base