Skip to main content

Prepare Site and Remove Old Retaining Wall

0:56
21:58
8.4K views

At 0:56 in

Building a Failed Boulder Wall

What happens here

Before removal, the work site is prepared, and existing small boulders from the failing wall are carefully extracted. An excavator, specifically a Daewoo 75V model, is brought into position. It is equipped with a CMP Attachments hydraulic grapple, which provides precise control for lifting and manipulating the rocks. Workers assist with shovels and hand placement, ensuring that the existing fence is temporarily moved aside to prevent damage. The process involves removing rocks and any underlying debris, effectively 'cleaning out' the failed structure. Geo-textile fabric is laid down in sections as the removal progresses to begin establishing a base for the new wall.

Goal: Prepare the work area by clearing vegetation and then use heavy machinery to carefully dismantle and remove the failing rock retaining wall. This involves using an excavator with a specialized grapple to lift and move boulders, ensuring safety and minimizing disruption to the surrounding area.

Tools and materials

  • Dump Trailer
  • Excavator
  • Hydraulic Grapple
  • Shovels
  • Geo-textile Fabric

What they say

Hide

a it's a shortcut that contractors we buy these by the ton, >> right? But we install them by the square foot. And when we buy small boulders by the ton, we can get more square feet because less boulder is going behind. That's not good though because what happens is you call us out for this. Look at that. That fence is jammed >> and it is going to come out a few more feet. So now it's going to be, you know, four to 4 and 1/2 ft tall. But >> Oh god, this is another one of those

Auto-generated from the video audio.