Install New Large Boulders and Drainage
At 1:25 in
Building a Failed Boulder Wall
What happens here
The replacement wall construction begins by preparing a stable base. Geo-textile fabric is laid out, followed by the careful placement of the new, larger boulders. Each boulder is strategically positioned, angled backward into the slope, and partially buried ('toe-in') to counteract soil pressure and enhance stability. As each layer of boulders is added, additional geo-textile fabric is installed, and drain tiles (perforated pipes) are placed behind the wall at the base. Granular material, like clean rock or gravel (not explicitly shown but implied for drainage), is backfilled around the drain tile and behind the boulders. A plate compactor (Wacker Neuson) is used to compact the backfill in lifts, ensuring a dense and stable foundation for the wall and preventing settlement. This meticulous approach addresses the drainage and stability issues that plagued the old wall, providing a long-term 'clean' solution.
Goal: Construct the new retaining wall by installing large, beefy boulders with proper angling and toe-in for maximum stability. This process includes laying geo-textile fabric, placing drain tiles for water management, and compacting the backfill to prevent future structural failures.
Tools and materials
- Excavator
- Hydraulic Grapple
- Plate Compactor
- Shovels
- Drain Tile
- Drainage Aggregate
- Geo-textile Fabric
- Large Boulders