Completing Retaining Wall and Backfilling
14:13
22:06
61.8K views
At 14:13 in
Building a Boulder wall Start to finish
What happens here
Construct the final section of the boulder retaining wall, carefully integrating it with the existing landscape. Behind the newly placed boulders, lay geotextile fabric to prevent soil erosion and improve drainage. Backfill the area with drainage rock (gravel) to prevent hydrostatic pressure buildup behind the wall. Finally, use a skid steer and hand rakes to grade the entire area with topsoil, ensuring a smooth transition to the existing lawn and proper water runoff.
Goal: Finish the retaining wall structure and prepare the area for planting/seeding.
Tools and materials
- Drainage rock/gravel — Backfilling behind the wall for drainage
- Geotextile fabric — Erosion control and drainage
- Hearing protection — Ear protection
- Hydraulic grapple CMP Attachments — Precise handling of boulders
- Large boulders — Completing the retaining wall
- Mini excavator Daewoo — Placing boulders and moving large quantities of soil/gravel
- Rakes — Fine grading and smoothing topsoil
- Safety glasses — Eye protection
- Shovels — Detailed work and moving materials
- Skid steer CAT — Spreading and grading topsoil and gravel
What they say
(2,089 characters)Hide
What they say
(2,089 characters)Auto-generated from the video audio.