Skip to main content

Base Preparation for Stone Steps

7:38
22:06
61.8K views

At 7:38 in

Building a Boulder wall Start to finish

What happens here

Prepare the area for the stone steps by excavating and then laying a base layer of recycled Class 5 gravel (a mix of 3/4-inch rock with fines). This base is thoroughly compacted using a vibratory plate compactor to create a solid foundation. Afterward, lay geotextile fabric (road fabric) over the compacted gravel base. This fabric prevents the base material from intermixing with the underlying soil, ensuring long-term stability and acting like a 'snowshoe' to distribute weight. More gravel is placed on top of the fabric.

Goal: Create a stable and well-drained base for the stone steps.

Tools and materials

  • Geotextile fabric Road Fabric — Separating base layers and improving stability
  • Hearing protection — Protecting ears from machinery noise
  • Level — Ensuring the base is flat and even
  • Rakes — Smoothing and preparing the surface
  • Recycled Class 5 gravel — Creating a stable base for the steps (3/4 inch rock with fines)
  • Safety glasses — Eye protection during compaction and material handling
  • Shovels — Spreading and leveling gravel
  • String line — Establishing straight lines and elevation guides
  • Tape measure — Measuring and marking distances
  • Vibratory plate compactor Wacker Neuson — Compacting the gravel base for stability

What they say

Hide

okay so tim is putting recycle class five down for the steps that's a three quarter inch rock and it has fines in it and then he packs it and it'll just act like concrete of course he uses the pad the mud flap in the front to make sure the rock face doesn't get scratched the backside won't be seen so it's not critical well we're gonna start prepping for the second set of stairs so we'll put in uh one two three here and then there's gonna be a landing and then we're gonna shoot for another two up to the sidewalk here

Auto-generated from the video audio.