First Course Block Placement

13:23
30:16
41.2K views

At 13:23 in

Building a Big Block Retaining wall 4K

What happens here

The large Rosetta blocks are carefully placed on the prepared gravel base. A mini excavator equipped with a block clamp is used to lift and position each block. Workers guide the blocks into place, ensuring they are properly aligned and level. Due to the tight working conditions under the deck, precise maneuvering of the excavator is essential. Shims and fine adjustments are made as needed to maintain perfect alignment and ensure a secure fit for each block.

Goal: Install the initial row of Rosetta blocks

Tools and materials

  • Block Clamp — Securely gripping and moving Rosetta blocks
  • Level — Checking the level and alignment of placed blocks
  • Mini Excavator Bobcat 325 — Lifting and placing heavy blocks
  • Rosetta Blocks Rosetta — Constructing the retaining wall
  • Rubber Mallet — Tapping blocks into final position without damaging them
  • Shovel — Making minor adjustments to the gravel base

What they say

Hide

that's good nope you're good you're touching you're touching on the bottom [Applause] you got a bunches under air [Music] so although these look like Natural Stone they are not they're actually manufactured by the same company that makes our Versa block standard units they just created a new mold and a new system and these blocks vary in shape and size to replicate what mother nature would do but they also have enough uniformity to allow us to speed up the installation process [Music] taste fingers out of the way am I dropping it out like yeah back back more yeah

Auto-generated from the video audio.