Skip to main content

Complete Deck Joist Installation

0:12
0:16
454.8K views

At 0:12 in

Best way to build a freestanding deck: lay your rim on the beam, nail from behind, push in to place.

What happens here

The video concludes as the workers are positioned to continue the repetitive process of installing additional joists. This implies the continuation of selecting, positioning, lifting, and securing each subsequent joist until the entire deck subfloor framework is complete. This step represents the bulk of the actual work for a deck framing project.

Goal: Construct the full deck joist framework.

Tools and materials

  • Cordless Drill / Impact Driver Milwaukee — Driving screws for joist hangers and other connections
  • Hammer Estwing — Driving nails or adjusting joist hangers
  • Joist Hangers Simpson Strong-Tie — Securing joists to the ledger board and rim joists for structural integrity
  • Pressure-Treated Lumber — Constructing the primary structural support for the deck surface
  • Safety Glasses 3M — Protecting eyes from wood splinters and debris
  • Speed Square Swanson — Marking and checking 90-degree angles for joist cuts and placement
  • Structural Screws or Nails GRK Fasteners — Fastening joists to hangers and other structural elements
  • Tape Measure Stanley — Measuring and maintaining consistent joist spacing