Final Inspection and Project Completion
0:27
0:32
7.7K views
At 0:27 in
Be classy, tuck your shirts in and tuck your flashing in 🫡
What happens here
Once the flashing is fully installed and secured, perform a visual inspection to ensure there are no gaps or areas where water could penetrate. The flashing should be flush against the house and the deck joists, with its vertical edge completely hidden behind the siding. This completes the installation, providing essential water protection for the house and deck structure.
Goal: Ensure the flashing is correctly installed and provides adequate water protection.
Tools and materials
- L-shaped Flashing — The installed component