Composite Decking Installation
2:31
11:58
224.1K views
At 2:31 in
Backyard Makeover Time Lapse Before and After - Ground Level Deck, Paver Patio, and Covered Pergola!
What happens here
With the deck sub-frame complete, composite decking boards are installed. Workers lay the boards across the joists and secure them using a drill and hidden fasteners (implied by the lack of visible screw heads) or screws. This step requires precision to ensure consistent spacing and a clean finish. The entire deck surface is covered with these durable composite boards.
Goal: Install the composite decking surface onto the sub-frame.
Tools and materials
- Composite Decking Boards — Creating the deck surface
- Drill — Securing decking boards
- Measuring Tape — Measuring decking boards
- Saw — Cutting decking boards to fit
- Hidden Deck Fasteners or Deck Screws — Attaching decking boards