Initial Site Preparation and Deck Foundation
At 0:00 in
Backyard Makeover - DREAM COME TRUE - Full Build Time Lapse
What happens here
Begin by accurately marking the footprint of the proposed outdoor living area adjacent to the house using spray paint and measuring tapes. Utilize an excavator (such as a CAT mini-excavator shown in the video) to dig trenches for the new deck's foundation and any necessary utility lines. Proceed with drilling post holes and setting concrete footings, ensuring they are level and properly spaced according to the design plan to provide a stable base for the deck structure. During this phase, lumber and other necessary building materials for the deck framing are delivered and organized on site.
Goal: This step involves marking out the new outdoor living space, excavating for the deck's foundation and utility lines, and installing concrete footings to support the structure.
Tools and materials
- Concrete
- Excavator (CAT mini-excavator)
- Lumber (various sizes)
- Measuring tape
- Spray paint
- Wooden stakes/forms