Skip to main content

Prepare Patio Base and Lay First Course of Blocks

0:17
13:41
11.1K views

At 0:17 in

BACKYARD BONANZA PT 2 - Installing Decking and Starting Paver Patio

What happens here

The project begins with an overview of the existing concrete patio that will serve as the base for the new multi-level outdoor living space. The first course of Techo-Bloc patio blocks are carefully positioned around the perimeter of the existing concrete. Wooden 2x4s are placed underneath the heavy blocks to facilitate lifting and applying adhesive. A string line is used to ensure precise alignment. Each block is gently tapped into place with a hammer or mallet after adhesive is applied.

Goal: Establish the perimeter and first layer of the patio using Techo-Bloc blocks over existing concrete.

Tools and materials

  • 2x4 Lumber — Used as temporary supports for lifting and applying adhesive to blocks
  • Adhesive — Securing the patio blocks to the concrete and to each other
  • Rubber Mallet or Hammer — Gently tapping blocks into position for level and secure placement
  • String Line — Ensuring straight and accurate placement of blocks
  • Tape Measure — Measuring and ensuring correct dimensions and spacing
  • Techo-Bloc Patio Blocks Techo-Bloc — Forming the perimeter and base of the patio