Skip to main content

Final Grading and Erosion Control Seeding

8:20
14:23
114.2K views

At 8:20 in

Awesome Progress Clearing land on our farm!

What happens here

After the initial heavy clearing, the next phase involves conditioning the soil and preventing erosion. This is achieved by using a TR3 rake to smooth the rough terrain left by the heavy machinery. Following grading, a precision seeder will be used to plant a mixture of warm-season grasses, including pearl millet, fescue, and annual ryegrass. This initial planting aims to establish a strong root base and foliage to prevent soil washout. In the fall, cool-season grasses like fescue and clover will be drilled in to further enhance the ground cover and soil stabilization.

Goal: Grade the cleared land and plant ground cover to prevent erosion.

Tools and materials

  • TR3 Rake — Smoothing the ground after heavy clearing
  • Tractor — Pulling the TR3 rake and precision seeder
  • Woods Precision Seeder Woods — Drilling in grass and clover seeds
  • Annual Ryegrass Seeds — Warm-season grass for quick establishment and erosion control
  • Clover Seeds — Cool-season legume for soil health and forage
  • Fescue Seeds — Both warm-season and cool-season grass for ground cover and forage
  • Pearl Millet Seeds — Warm-season grass for initial ground cover