Prepare Bedding Layer and Set Guides
0:00
0:51
2.1K views
At 0:00 in
Ask and you shall receive my friend! π
What happens here
The video begins with the workers preparing the sub-base, which appears to be compacted crushed stone or gravel. They use metal screed rails or pipes placed across the prepared base. Sand or a fine gravel bedding layer is then spread over the base and leveled using a screed board, pulled along the rails to create a smooth, even surface with the correct slope for drainage. They also appear to be marking out the patio area with string lines.
Goal: Create a level and properly sloped bedding surface for pavers
Tools and materials
- Compacted Sub-base β The underlying structural layer for the patio, assumed to be pre-existing
- Rake Unspecified β Spreading the bedding material evenly before screeding
- Screed Board β Leveling the bedding layer by pulling it across the screed rails
- Screed Rails β Guiding the screed board to create a consistently level bedding layer
- Shovel Unspecified β Moving and distributing the bedding material
- String Line and Stakes Unspecified β Marking the layout of the patio and establishing reference lines for straightness and grade
- Paver Base Sand β Creating a stable, level, and permeable bedding layer for the pavers to rest on
What they say
(52 characters)Hide
What they say
(52 characters)Auto-generated from the video audio.