Install Assembled Trim Sections
1:40
2:00
60.8K views
At 1:40 in
ANOTHER use for pocket screws?! Count me in!
What happens here
With the PVC trim section assembled, carefully lift it into position under the roof overhang. Align the section with the existing structure and ensure the angles fit snugly. Once positioned correctly, use a nail gun to fasten the trim securely to the roof framing. The video shows the worker using a pneumatic nail gun to drive finishing nails, creating a secure attachment. Continue this process for all sections of the soffit and fascia trim.
Goal: Securely attach the pre-assembled PVC trim to the roof overhang.
Tools and materials
- Assembled PVC Trim Section N/A — The pre-fabricated section being installed
- Finishing Nails — Securing the trim to the framing
- Ladder — Accessing the roof overhang
- Nail Gun — Fastening the trim to the structure
- Safety Glasses — Eye protection during nailing