Demonstrate Waterproofing in Cracked Concrete Sample
At 0:40 in
An amazing demonstration. #concrete #cement #diy #construction #tools #shorts
What happens here
The presenter displays a pre-prepared concrete sample that has been mixed with 16% Rebotec and allowed to cure. This concrete sample has an intentional, visible crack running through it. Water is poured directly into the 'cup' formed by the concrete sample, filling it above the crack line. The presenter holds the sample, turning it to show that despite the significant crack, the water does not leak through the bottom or sides. He points out 'shining bubbles' within the crack, explaining this is Rebotec actively pushing water out, preventing it from penetrating.
Goal: A concrete sample, pre-mixed with 16% Rebotec and intentionally cracked, is filled with water to show that no leakage occurs through the crack.
Tools and materials
- Water Bottle
What they say
(914 characters)Hide
What they say
(914 characters)Auto-generated from the video audio.