Plan Winter Excavation for Building Addition
At 13:28 in
2 days at work, 6 landscape Construction sites, 1 big problem plus an Abandoned House? vlog #0003
What happens here
At Site #5, the project involves excavating for a 14-foot addition, extending a garage to create additional stalls. This requires significant soil removal, as there is no space on-site to store the excavated material, necessitating its export. The host highlights the extreme difficulties and increased costs of performing such excavation in January or February in Minnesota due to deep frost. He mentions the need for specialized 'frost chargers' or 'frost ripping chargers' to break up frozen ground, which are charged at an hourly rate ($150/hour). This significantly increases project costs and complexity, and directly impacts any underground utility trenching that would need to happen in conjunction with the foundation work. The hay seen on the ground is for frost protection. The team ultimately advises the customer to reconsider winter excavation and wait for spring to save on costs and avoid potential issues.
Goal: The team plans the excavation for a 14-foot addition, considering challenges like soil export and the cost implications of winter frost in Minnesota.
Tools and materials
- Dump Trucks
- Excavator/Ditch Witch
- Frost Ripping Chargers
- Hay/Straw
What they say