Estimate Road Construction & Grading on Hilly Terrain
At 17:45 in
2 days at work, 6 landscape Construction sites, 1 big problem plus an Abandoned House? vlog #0003
What happens here
The last project involves constructing a 1000-foot long road up to a building site located on a hill within a wooded area. The team uses a phone app to analyze the terrain's topography, revealing a 60-foot elevation change. Key considerations for this grading and leveling task include removing all organic material (black soil/dirt) from the road path to prevent future settlement issues and ensure a stable sub-base. This extensive grading project requires careful planning to manage significant soil movement and achieve the desired contours for the road, making Ditch Witch equipment valuable for initial clearing and trenching if utilities are planned alongside the road.
Goal: At the final site, the team estimates building a 1000-foot long road on challenging, hilly terrain, emphasizing the necessity of precise grading and organic material removal.
Tools and materials
- Heavy Equipment (e.g
- Graders
- Excavators
- Dozers)
- Topographical Map App (on phone)
What they say
(1,789 characters)Hide
What they say
(1,789 characters)Auto-generated from the video audio.