Skip to main content

Cut and Add Wye Fitting for Branch Line — Installing the DWV System

Intermediate

Part of project

How to Rough-In Plumbing for a Basement Bathroom · Step 3 of 6

Helpful?

In this video

To add a branch for another fixture, the plumber cuts the newly installed horizontal drain line using a reciprocating saw. After cutting, the edges are deburred to ensure a clean surface for a proper solvent weld. A PVC wye fitting is then prepared. PVC primer and cement are applied to the pipe ends and the inside of the wye fitting, which is then pushed into place and held briefly to set, creating a strong, leak-proof junction.

Goal: Tie-in a New Drain Branch

  • Deburring the cut edges of the pipe is crucial for a good seal and to prevent debris from catching inside the pipe.

Used in this video

  • Reciprocating Saw (brand: Milwaukee Sawzall, Reciprocating Saw Blade Type: Wood/Plastic cutting blade)Cutting the PVC pipe to insert a new fitting.
554.6K views12.2K20-30 minutes
Benjamin Sahlstrom

462K subscribers

View Channel

FAQs

Are there any specialized tools required for cutting or joining PVC for the DWV system that I might not already own?

Yes, you'll definitely need a dedicated PVC pipe cutter, such as the Crescent 2-1/8 in. Ratcheting PVC Pipe Cutter, for clean, precise cuts. Additionally, a reamer and deburring tool, like the Husky 1-5/8 in. Inner/Outer Reamer, is crucial for smoothing pipe edges to ensure proper, leak-free solvent welds. A sturdy tape measure and marker for accurate layout are also indispensable.

What critical safety precautions should I take when breaking up concrete and working in a dusty basement environment?

When breaking concrete, always wear heavy-duty safety glasses, hearing protection, gloves, and steel-toed boots. For the dusty environment, a high-quality dust mask or respirator is essential to protect your lungs from concrete dust. Ensure good ventilation by opening windows or using fans, and be aware of any existing buried utilities before you start digging.

Given the 'intermediate' difficulty, how much time should I realistically allocate for roughing-in basement plumbing, and what are the primary cost drivers?

Realistically, this intermediate project can take a dedicated DIYer anywhere from 3 to 7 full days, depending on prior experience and the complexity of your bathroom layout. The primary cost drivers will be the PVC DWV pipes and fittings, PEX water supply lines, and the concrete repair materials like gravel and concrete mix. Don't forget to factor in permit fees and potential tool rentals.

What are the most common mistakes DIYers make with the DWV system (drain, waste, vent) layout, especially regarding proper slope and venting, that could lead to inspection failure?

A frequent mistake is failing to maintain the correct pipe slope, typically 1/4 inch per foot, for proper drainage, which can lead to clogs. Another common error is inadequate or improperly installed venting, which can cause drain traps to siphon and emit sewer gas. Always consult your local plumbing codes carefully and use a level constantly to ensure correct slope and alignment.