Build and Install Railings — Install Handrails and Guardrails
Part of project
How to Measure Alternating Tread Stairs · Step 10 of 10
In this video
To complete the structure and ensure safety, construct and install the railing system for both the landing and the stairs. Begin by installing sturdy newel posts (typically 4x4 pressure-treated lumber) at the corners of the landing, at the top and bottom of the stairs, and at any change in direction. Secure these posts firmly to the landing frame or stringers using structural bolts or screws. Next, cut and attach the top and bottom rails between the newel posts. Finally, install the balusters (pickets) evenly spaced between the top and bottom rails, ensuring the spacing meets local building code requirements (typically no more than a 4-inch gap). Fasten all railing components securely.
Build and Install Railings — Install Handrails and Guardrails
Part of project
How to Measure Alternating Tread Stairs · Step 10 of 10
In this video
To complete the structure and ensure safety, construct and install the railing system for both the landing and the stairs. Begin by installing sturdy newel posts (typically 4x4 pressure-treated lumber) at the corners of the landing, at the top and bottom of the stairs, and at any change in direction. Secure these posts firmly to the landing frame or stringers using structural bolts or screws. Next, cut and attach the top and bottom rails between the newel posts. Finally, install the balusters (pickets) evenly spaced between the top and bottom rails, ensuring the spacing meets local building code requirements (typically no more than a 4-inch gap). Fasten all railing components securely.