Skip to main content

Step 6 · Final Inspection and Cleanup

Conduct a thorough final inspection of your work. Tug gently on all installed shield pieces to ensure they are securely fastened. Visually confirm that all pipes and potentially abrasive or hot surfaces are covered. Run your hand over the entire installation to feel for any sharp edges you may have missed. Verify that you can still access and operate the shut-off valve handles. Once satisfied, turn the angle stops back on by turning the handles counter-clockwise. Watch the connections for a minute to ensure no leaks were created. Finally, remove the drop cloth and clean up any tools and cutting debris from the area.