Skip to main content

Step 11 · Final Inspection and Testing

Perform a comprehensive check of the entire cable railing system. Ensure all posts are secure and plumb, all termination hardware and tensioners are properly installed and tightened, and all cables are taut and evenly spaced. Push and pull on the railing to test its stability and rigidity. Check for any sharp edges or potential hazards. Verify compliance with local building codes for railing height and cable spacing.