Trench Cut & Underground Vault Work
6:12
15:20
87.3K views
At 6:12 in
Working on an underground Vault lid at a Commercial Excavation site
What happens here
The narrator highlights the 'stepped cut' of the trench, which is a safety feature to prevent collapse on a slope. Inside the concrete vault, workers are seen replacing old, inoperable valves with modern ones that allow for better isolation of different services. They apply a 'Ramnek' product, a butyl rubber weatherstripping, around the edges of the vault and then cover the pipes with insulation to prevent corrosion and maintain temperature.
Goal: Understand trench safety design and observe the repair and insulation of underground utility components.
Tools and materials
- Brush/Broom — Cleaning surfaces before applying weatherstripping
- Butyl Rubber — Weatherproofing around the vault lids
- Insulation — Protecting pipes from corrosion and maintaining temperature
- Ladders — Accessing the trench and vault
- New Valves — Replacing old, inoperable valves in the utility system
- PVC Piping — New sections of the utility system
What they say
(1,247 characters)Hide
What they say
(1,247 characters)Auto-generated from the video audio.