Assess Panel and Plan Breaker Placement

0:00
1:01
17.8K views

At 0:00 in

Why Service Electricians have it Rough #bluecollar

What happens here

Before beginning any electrical work, always ensure the main power to the electrical panel is turned off at the main disconnect. The project starts by assessing the electrical panel to identify available slots. If the panel is full, the method involves replacing existing standard (single-pole) circuit breakers with tandem breakers to free up space. The electrician points out that two slots are needed for a 40 amp breaker. He identifies the type of panel as a Square D QO, which is important because it features specific 'Q O hooks' or notches for compatible tandem breakers. The video shows the electrician looking for spots and needing a flat-head screwdriver.

Goal: Determine how to create space for the new circuit breaker in a full panel.

Tools and materials

  • Flat-Head Screwdriver — Potentially removing the panel cover, though not explicitly shown for this, it's mentioned as needed
  • Headlamp — Providing hands-free illumination inside the electrical panel
  • Voltage Tester Fluke — To confirm that power is off before touching any components. (Not shown, but essential for safety)

What they say

Hide

got to make sure we have slots man two slots to put in a 40 amp nice see put these tandems in yeah make sure if I have a spot to put them now why cuz there hooks right the hooks are like qo hooks I need flaad man yeah I got it I was doing some conduit work outside conduit Master yeah you didn't tell me man the thing about El electrical work boys if you respect it it will respect

Auto-generated from the video audio.