Level and Compact the Ground
0:27
0:36
27.4K views
At 0:27 in
Why are demo clips so satisfying to watch?? #demodays #demo #construction #hardscape #hardscaper
What happens here
With all concrete removed, the exposed soil must be prepared to create a stable foundation for the new structure. Use a rake or shovel to roughly level the ground, filling in any low spots and evening out high spots. Then, operate a vibratory plate compactor across the entire area. Make multiple, overlapping passes (typically 2-3 passes in perpendicular directions) to ensure uniform compaction, which helps prevent future settling and provides a solid base for construction.
Goal: Create a stable, dense, and level sub-base.
Tools and materials
- Hearing Protection — Protecting ears from compactor noise, Long Level Unknown
- Soil N/A — The ground being prepared for new construction, Water N/A used for Lightly moistening dry soil for better compaction