Skip to main content

Develop and Explain Soil Correction Strategy

1:06
6:25
1M views

At 1:06 in

When the Customer is Wrong....

What happens here

Given the high groundwater levels, a soil correction is required to create a stable base for the planned paver patio. The strategy involves using three to six-inch riprap as the first layer, which is a clean, unbound rock material. This riprap will be brought up to just above the water elevation. A layer of filter fabric will then be laid over the riprap to separate it from the next layer. Finally, structural fill will be used to bring the area up to the desired elevation for the paver patio. This specific riprap without a binder is chosen because it can lock into place under water without needing compaction, unlike materials with binders that would not compact effectively when saturated.

Goal: Formulate a plan to stabilize the ground above the high water table.

Tools and materials

  • 3-6 Inch Riprap Local Quarry — First layer of drainage and stabilization above groundwater
  • Structural Fill Local Quarry — Final layer to reach desired elevation and support paver patio

What they say

Hide

at this swimming pool you see that water in the bottom that's actually not contained by the swimming pool it's coming up from underneath the swimming pool there's going to be a paver patio built exactly on the deep end of this swimming pool because the groundwater is so high in this area we've got to do a soil correction the way we're going to do that we're going to bring three to six inch riprap in we're going to bring that up just above the water elevation then we're going to lay filter fabric to separate the riprap and then we're going to use structural fill to bring the rest of the elevation up to the bottom of the paver patio that way we know we can safely build a paver patio we proceeded

Auto-generated from the video audio.