Develop and Explain Soil Correction Strategy
At 1:06 in
When the Customer is Wrong....
What happens here
Given the high groundwater levels, a soil correction is required to create a stable base for the planned paver patio. The strategy involves using three to six-inch riprap as the first layer, which is a clean, unbound rock material. This riprap will be brought up to just above the water elevation. A layer of filter fabric will then be laid over the riprap to separate it from the next layer. Finally, structural fill will be used to bring the area up to the desired elevation for the paver patio. This specific riprap without a binder is chosen because it can lock into place under water without needing compaction, unlike materials with binders that would not compact effectively when saturated.
Goal: Formulate a plan to stabilize the ground above the high water table.
Tools and materials
- 3-6 Inch Riprap Local Quarry — First layer of drainage and stabilization above groundwater
- Structural Fill Local Quarry — Final layer to reach desired elevation and support paver patio
What they say
(702 characters)Hide
What they say
(702 characters)Auto-generated from the video audio.