Lay and Roughly Level the Gravel Sub-Base
0:08
0:39
3.1K views
At 0:08 in
Wheaton pool hole
What happens here
While the video already shows workers with a layer of gravel, this step in a DIY sequence would involve introducing and roughly leveling the initial layer of crushed stone or gravel into the excavated pit. This material provides a stable, free-draining foundation. The material should be spread relatively evenly, aiming for a base thickness specified by the pool manufacturer or local building codes, typically 4-6 inches. Use shovels to distribute the gravel and rakes to spread it out.
Goal: Establish a primary layer of gravel for drainage and initial support.
Tools and materials
- Rakes — For spreading the gravel evenly across the base
- Shovels — For distributing the gravel into the pit
- Wheelbarrow — For transporting gravel from the delivery point to the pit
- Crushed Stone/Gravel N/A — The primary material for the pool base, providing stability and drainage