Skip to main content

Install Windows

0:00
0:38
5.3K views

At 0:00 in

Whats your favorite interesting feature of your workshop??

What happens here

The first step involves installing new windows into the pre-framed rough openings. Two workers are shown collaborating; one window is already installed. They carefully lift the second window, ensuring it is level and plumb within the rough opening. While not explicitly shown in detail due to the time-lapse, this process typically involves shimming the window to achieve a perfect fit, securing it with fasteners (nails or screws) through the side flanges into the framing, and then sealing around the perimeter with flashing tape and sealant for weatherproofing.

Goal: Securely install new windows into rough openings

Tools and materials

  • Cordless Drill/Driver Milwaukee — Driving fasteners to secure the window frame
  • Fasteners — Securing the window frame to the rough opening
  • Level — Ensuring the window is perfectly horizontal and vertical
  • Pre-hung Windows — Providing natural light and ventilation to the attic space
  • Tape Measure — Measuring rough opening and window dimensions
  • Utility Knife — Cutting flashing tape or other materials
  • Wood or Plastic Shims — Leveling and plumbing the window within the rough opening
  • Exterior Sealant/Caulk — Sealing any gaps between the window frame and the house wrap/sheathing
  • Flashing Tape — Sealing the window flanges to the wall sheathing for weather protection