Skip to main content

Stage and Place Culvert Pipes

0:23
0:55
16.5K views

At 0:23 in

We're Changing the Farm Forever!

What happens here

With the creek bed partially prepared, the next phase involves staging and placing the culvert pipes. The presenter showcases a variety of pipes that will be used: a large, robust corrugated metal culvert pipe, as well as several smaller corrugated metal and black corrugated plastic pipes. He highlights the significant cost of such materials, noting that he acquired these particular pipes through a "trade" many years ago. A track loader is briefly shown maneuvering the large corrugated metal pipe, indicating that heavy equipment is used for their precise placement across the creek bed. The strategic arrangement of these pipes is crucial to ensure effective water drainage and create a stable, load-bearing surface for the crossing.

Goal: Place drainage pipes to establish the base of the creek crossing

Tools and materials

  • Black Corrugated Plastic Culvert Pipes — Additional drainage, often for lower flow or lighter load areas
  • Large Corrugated Metal Culvert Pipe — Primary drainage channel and structural support for the crossing
  • Smaller Corrugated Metal Culvert Pipes — Additional drainage or to supplement the main culvert
  • Track Loader — Maneuvering and placing the heavy culvert pipes