Skip to main content

Setting and Leveling Posts with Perimeter Framing

0:32
41:38
6.9K views

At 0:32 in

We tried something INSANE on this deck build

What happens here

After successfully digging the necessary post holes, wood posts are inserted into the ground. These posts are then measured, cut to the appropriate height, and leveled to ensure a stable foundation for the deck frame. The crew works to square up the posts and set the initial perimeter framing using treated lumber.

Goal: Establish a level and square foundation for the deck.

Tools and materials

  • Circular Saw DeWalt — Cutting lumber to size
  • Level N/A — Ensuring posts and frame are plumb and level
  • Tape Measure N/A — Accurate measurement of posts and framing
  • Treated Lumber — Building the perimeter frame of the deck
  • Treated Wooden Posts N/A — Vertical supports for the deck structure

What they say

Hide

[Music] Good. Some people's birds. Good morning, one and all. Okay, we've got an especially

Auto-generated from the video audio.