Digging Post Holes for Deck Foundation
0:14
41:38
6.9K views
At 0:14 in
We tried something INSANE on this deck build
What happens here
Utilize a gas-powered EarthQuake auger to dig multiple holes for the deck posts. The auger is used by two individuals, demonstrating that a one-person operation is difficult in tight or rocky conditions. Rocks encountered during drilling are manually removed to clear the path for the auger.
Goal: Create stable post holes for the deck foundation.
Tools and materials
- Auger Bits — Cutting into the soil (e.g., 6, 8, 10, 12-inch sizes)
- Digging Bar — Loosening stubborn rocks or compacted soil
- EarthQuake Auger EarthQuake — Digging post holes for the deck foundation
- Shovels — Removing loose soil and rocks from post holes
What they say
(208 characters)Hide
What they say
(208 characters)Auto-generated from the video audio.