Skip to main content

Resume Work on Day 2

7:03
28:37
32.2K views

At 7:03 in

Unbelievable Sawmill Failure During Father-Son Project...Why did this happen?

What happens here

After a productive evening of log preparation, the team returns the following day (Day 2) to continue the milling process. The truck, loaded with previously milled lumber, is strategically positioned near the sawmill and the remaining logs. The presenter's father joins him to assist with loading logs and offloading milled lumber, indicating a collaborative effort for the day's work.

Goal: Continue lumber milling with assistance

Tools and materials

  • Pickup Truck with Flatbed — Transporting milled lumber