Trenching and First Layer of Boulders
1:07
22:58
56.7K views
At 1:07 in
Turning a hill into a Flat yard
What happens here
Dig a trench along the intended path of the retaining wall. This trench will serve as the base for the first layer of boulders. Then, lay down heavy-duty black geotextile fabric (also referred to as 'boulder fabric') along the trench. This fabric prevents soil erosion and maintains drainage behind the wall. Carefully place the first layer of large boulders (weighing 1000-3000 lbs each) onto the fabric, ensuring they are stable and interlocked.
Goal: Establish the base and initial structure of the boulder retaining wall.
Tools and materials
- Daewoo Solar 75V Excavator Daewoo — Digging the trench and placing boulders
- Heavy-duty Geotextile Fabric — Separating soil layers, preventing erosion, and maintaining drainage behind the wall
- Hydraulic Grapple Attachment Attachments — Grabbing and positioning large boulders
- Large Boulders — Building the retaining wall structure (1,000-3,000 lbs each)
What they say
(187 characters)Hide
What they say
(187 characters)Auto-generated from the video audio.