Skip to main content

Acquire and Begin Spreading Black Dirt

0:00
32:44
178.6K views

At 0:00 in

Trying a New Attachment on the Grading Disaster- FINALE

What happens here

The project begins with the delivery of multiple dump truck loads of black dirt to the site. The speaker describes initial delays and frustrations with the delivery schedule. Once the dirt arrives, a skid steer loader is used to roughly spread the black dirt across the sloped terrain. The primary goal at this stage is to distribute the bulk material to the areas requiring fill, without compacting it or achieving a final grade. This initial spreading prepares the ground for more detailed work with the power rake.

Goal: The initial phase involves receiving multiple loads of black dirt and performing a rough spread over the designated sloped area. The material must be spread generally where it's needed, but without immediate concern for fine grading.

Tools and materials

  • Dump Truck
  • Skid Steer Loader (CAT 242D)
  • Black Dirt (Topsoil)

What they say

Hide

a job like this all the cogs and the wheel have to fit together to make everything flow seamlessly one of our cogs doesn't seem to quite fit with the rest of the cogs i'm talking about as you see that it's empty supposed to have three loads of black dirt i had one brought last night and the other two i needed right away let's see what right away is 8 44. to me that's not right away you guys see any black dirt i was salty i don't i think i need a new cog for the wheel that sits behind the truck drive the steering wheel of my dump truck 20 minutes i'm gonna go get the load of dirt myself if i don't have a load of dirt by nine o'clock i'm not stopping i'm kind of getting pissed again i hate this oh here we go honestly i'm so pissed i don't even want to sit i got nothing to say i'm like just dump it and go just get my next load go

Auto-generated from the video audio.