Stabilizing and Shaping the Bank with Structural Fill
2:45
20:12
211.6K views
At 2:45 in
TOUGH DAY on the Farm job
What happens here
The old retaining walls have been removed, leaving a steep bank. To stabilize this, non-organic structural fill soil with a high clay binder is imported. The ASV RT-75 skid steer is used to push and compact this new soil to form a more stable bank. The operator describes picking material from the top down to achieve precision in shaping the bank. This clay-rich soil allows for better shaping and compaction.
Goal: Create a stable and properly graded bank after retaining wall removal.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer ASV — Spreading and compacting structural fill
- Non-organic structural fill soil — Stabilizing and shaping the bank
What they say
(950 characters)Hide
What they say
(950 characters)Auto-generated from the video audio.