Final Grading, Soil Improvement & Debris Disposal
At 11:10 in
TOUGH DAY on the Farm job
What happens here
With the most challenging debris removed, the ASV RT-75 continues final grading across the site. Four loads of pulverized, screened black dirt are imported and spread, then tilled into the subsoil using the power rake to avoid layering and promote healthy growth. Remaining smaller rocks and debris are collected and pushed into a designated area for burial and compaction, a cost-effective alternative to hauling away. The team then removes a section of asphalt driveway by saw-cutting and using the Volvo skid steer with a standard bucket to lift and haul away the pieces.
Goal: After clearing major obstacles, the site undergoes final grading, topsoil application, and the controlled burial of remaining debris, followed by asphalt removal.
Tools and materials
- ASV RT-75 Compact Track Loader ASV
- Pulverized Screened Black Dirt
What they say
(1,683 characters)Hide
What they say
(1,683 characters)Auto-generated from the video audio.