Introduction and Site Assessment

0:00
17:44
27.5K views

At 0:00 in

This was harder than I thought! Building a new roadway driveway on the farm!

What happens here

The video introduces the project to construct a cattle crossing over a gully that separates different sections of the farm. The current method of moving 50 cows involves crossing a public highway or leading them through a pasture they wish to avoid. The gully is identified as a spring-fed, seasonally wet/dry runoff area, approximately 4-5 feet deep with steep drop-offs. A 4-foot culvert pipe is shown, destined for installation in the gully. An old tobacco barn foundation on the side of the gully is highlighted as a future site for piling and burning cleared debris. The necessity of using chainsaws for initial clearing of overgrown brush and logs is established, as the area had previously been mulched but regrew dense vegetation.

Goal: Understand the project's purpose and assess the terrain.

Tools and materials

  • 4-foot Culvert Pipe — Creating the base for the road crossing over the gully
  • Forestry Mulcher — Past clearing of brush (shown in flashback)
  • Honda Pioneer UTV Honda — Transporting tools and equipment around the farm