Install Retaining Wall Base and First Course
8:59
33:59
92.4K views
At 8:59 in
This DIY Method Will Block Loud Road Noise In Your Backyard
What happens here
After preparing the berm, measure the distance from the fence (7 feet) and mark it using a tape measure and string line. Dig a trench along this line and lay a base layer of paver sand to ensure a level foundation for the retaining wall. Install the first course of concrete retaining wall blocks, ensuring they are perfectly level using a spirit level. This process is crucial for the stability and aesthetics of the entire wall. The blocks are interlocking, so no adhesive is initially needed for the first few courses.
Goal: Establish a level and stable foundation for the retaining wall.
Tools and materials
- Hammer — Driving stakes and making minor adjustments
- Rubber Mallet — Gently tapping blocks into place
- Shovel — Digging the trench
- Spirit Level Stanley — Ensuring blocks are level
- String Line — Marking a straight line for the trench
- Tape Measure — Measuring the distance from the fence
- Wheelbarrow Husky — Transporting sand
- Work Gloves Milwaukee — Hand protection
- Concrete Retaining Wall Blocks — Constructing the retaining wall
- Paver Sand — Creating a level base for the retaining wall
What they say
(2,498 characters)Hide
What they say
(2,498 characters)Auto-generated from the video audio.