Site Preparation and Initial Layout
0:00
0:43
5.4K views
At 0:00 in
This deck is MASSIVE!
What happens here
The project begins with two workers in a prepared outdoor area, which appears to be a leveled gravel or crushed stone base adjacent to a house. They are seen inspecting the ground and perhaps marking out the initial layout for the deck frame. This phase focuses on ensuring the foundation is stable and ready for construction.
Goal: Prepare a stable and level base for the deck frame.
Tools and materials
- Gravel Unspecified — Creating a level and stable base for the deck frame