Skip to main content

Site Challenges and Inflated Expenses

3:59
13:40
3M views

At 3:59 in

The WORST contractor SCAM I've seen!

What happens here

The speaker visits a current construction site to visually explain the process. He shows the concrete forms used for pouring foundations, noting that some forms can stay on, while others use insulated forms or concrete masonry units. He points out that all excavated material is typically backfill material and usually stays on-site. However, at the scammed project's site, the soil was super dense and tight, requiring expensive hauling of all excavated material off-site. Additionally, the need for de-watering the site and incorporating rock into the foundation significantly increased the project's costs, adding to the opportunities for fraudulent charges.

Goal: Recognize how site conditions can inflate costs and create opportunities for scams.

Tools and materials

  • Backfill material N/A — Filling in excavated areas around the foundation
  • Concrete forms Western Forms — Molding concrete for foundations
  • Rock N/A — Incorporation into the foundation structure

What they say

Hide

also invested in this project. Let's go in and see what typical earthworks look like. This is not my facility, and we may get kicked out, but we will show them what is going on here. So these guys are installing this...this is concrete formwork. Hello, how are you? Oh, yes. You're Dirt Monkey from YouTube . Yes. Yes. How is it? Good. How are you doing? Very good. I'm making a video about the biggest contractor scam I've ever seen. Really? And what formwork do you use? So, these guys can Western Forms. Western Forms. So you're making a monolithic concrete basement. Right. Yes. Perfectly. What is your name ? Charles. Nice to meet you, Karl. Mutually. Do you mind if I look around? Yes. Thanks, man. Thank you. This is the same type of basement that that general contractor did on the site where he scammed everyone. And if you look at these things, they put up the formwork, then they pour the concrete inside, and then they take the formwork down. Some people use insulating formwork, and then it can stay in place. And there is also an option where they use concrete blocks, and they simply build the foundation block by block. This is all backfill soil, and it usually remains on the site. But the area we were working on was very tight, cramped, and we couldn't leave the material in place. So everything had to be taken out, which increased costs. My first part of the excavation alone cost 20 thousand. This did not include the export and import of materials . This needs to be drained. It's never Oh, look, they put stones in the middle. Yes, sometimes you have to do that. This just increases costs. Placing these stones in the middle. But here we have disgusting clay soils. They are simply, simply not suitable for backfilling

Auto-generated from the video audio.