Excavate and Install Ledger Stone Step

0:17
0:30
13.7K views

At 0:17 in

The story behind the step. #hardscape #paverpatio

What happens here

To address the identified issue, the excess soil that formed the "hump" was excavated and removed to achieve a level sub-base. Following this, a ledger stone step was installed at the base of the deck stairs. This step serves as a solid, level, and durable transition from the deck to the area where the patio will be built, eliminating the previous problematic soil-to-wood interface. While the video does not explicitly show these actions, the narrator describes them as completed prior to the compaction phase.

Goal: Remove excess soil and install a permanent, level transition step.

Tools and materials

  • Compacted Aggregate Base — Providing a stable foundation for the ledger stone step
  • Ledger Stone Step — Creating a durable and level transition from the deck to the patio area
  • Level — Ensuring the excavated area is flat and has the proper slope
  • Shovel — Excavating and removing excess soil
  • String Line — Establishing consistent grade and level during excavation
  • Wheelbarrow — Transporting removed soil