Plan and Initial Indoor Panel Connection
0:00
1:53
33.9K views
At 0:00 in
The LONGEST EV Charger Wire Run EVER! 125 FT Run in a Residential Home, Thoughts? #hendythesparky
What happens here
The project begins with connecting the 6/2 MC (Metal Clad) cable to a new 50 Amp circuit breaker within the main electrical panel. The video highlights that this was a 'long run' which implies significant planning for routing through various parts of the house. Ensure the main power is off before beginning any work on the electrical panel.
Goal: Connect to main panel and start indoor cable run
Tools and materials
- 50 Amp Circuit Breaker — Providing overcurrent protection for the EV charger circuit, 6/2 MC Cable Unknown