Skip to main content

Install the First Wood Slat

0:11
0:45
8.5K views

At 0:11 in

That wood tone 🤤

What happens here

Begin the installation by carefully placing the first wood slat against the wall surface, which is covered with Tyvek Housewrap. Use a hammer to gently tap the slat into its initial position, ensuring it is plumb and correctly aligned. The Tyvek housewrap serves as a weather-resistant barrier behind the wood siding.

Goal: Secure the initial wood slat as a guide for subsequent pieces

Tools and materials

  • Hammer — Gently tapping slats into place for initial positioning
  • Level — Ensuring the first slat is perfectly plumb
  • Tyvek Housewrap DuPont Tyvek — Serving as a weather-resistant barrier behind the siding
  • Wood Slats Maximo Wood — The first piece of siding to be installed