Skip to main content

Establish and Record Benchmark

13:26
20:31
788.4K views

At 13:26 in

Teaching a NOOB how to read grade, Run a laser & change elevations on a jobsite- PT 1/2. 4k video

What happens here

The presenter guides Alex to establish a permanent benchmark using the actual concrete pad of the garage, as it's a stable, unmoving reference point. He instructs Alex to place the grade stick on the pad, adjust the receiver to the laser beam, and read the precise elevation. The reading obtained is 6 feet, 2 and 3/4 inches. The presenter advises Alex to write this down on his phone, emphasizing that this benchmark is critical for all subsequent measurements throughout the job, as many numbers will be used.

Goal: This step involves establishing a stable benchmark on the concrete pad of the garage, taking an accurate laser reading with the grade stick, and recording it as the primary reference elevation.

Tools and materials

  • DeWalt Laser Receiver
  • Grade Stick
  • Smartphone

What they say

Hide

to be lower then and then we'll get started actually doing that your benchmark is the is gonna be right here so this benchmark is the number that we're aiming for that we're gonna use so we're gonna use the actual concrete pad because the if it rains or some or somebody kicks some dirt that that can change the concrete pad won't isn't as likely to change so do we got a beat yeah let's bring her down so we can hear that beat once all right so right about there we're good all right so what is that number right now Alex two and two quarters of an inch six two and three quarters so this is where you probably would take some notes on this thing right six foot two three quarters because you're not going to remember that all day long because we're gonna be throwing a lot of numbers at you so you got your phone you can take a note on it yeah so your benchmark is six foot two and three quarters because we got more numbers coming at you in just a moment so I told you we got more numbers coming at you here's the next set of numbers you need for just general water and pitch to control runoff it's one inch of drop for eight foot of run okay that's a

Auto-generated from the video audio.