Place and Level Railroad Ties
11:57
31:22
10.5K views
At 11:57 in
Teaching a Laborer TO THINK like a LEADER #1
What happens here
Place the first railroad tie onto the prepared leveling sand base. Using a Milwaukee Redstick level, check for levelness side-to-side and ensure a slight forward pitch (a quarter-bubble) for water drainage. Adjust the sand underneath as needed to achieve the correct level and pitch. The second railroad tie is then placed immediately next to the first one, ensuring it also sits level and with the correct pitch. Ensure both ties are flush and aligned. The ties are connected together to prevent independent movement.
Goal: Install and level the railroad ties for the stair treads.
Tools and materials
- Milwaukee Redstick Level Milwaukee — Checking levelness and pitch of the ties
- Railroad Ties — Forming the steps
- Rake — Adjusting sand underneath the ties
- Shovel — Adjusting sand underneath the ties
- Leveling Sand — Making precise adjustments to the base