Receive and Unload Fill Dirt for Pond Dam

6:26
13:38
44.3K views

At 6:26 in

Swimming hole part 2...moving logs

What happens here

The dump truck driver begins arriving with loads of fill dirt, which is crucial for building up the pond's dam. The host expects approximately 10 tandem dump truck loads of this 'fill dirt' (not topsoil) to be delivered. A bulldozer is positioned to assist the dump truck, pushing dirt from an elevated position into the truck bed, allowing for efficient loading and unloading as the dam is constructed. This dirt is being strategically placed to form the new pond banks.

Goal: Multiple tandem dump trucks deliver fill dirt to the pond site, with a bulldozer assisting in the unloading process by pushing the dirt into the truck bed from above.

Tools and materials

  • Bulldozer (CAT 953C)
  • Tandem Dump Truck
  • Fill Dirt

What they say

Hide

good stuff alright let's talk about money so money-wise were being charged 125 bucks an hour about six hours into this and the dump truck driver is charging us a hundred bucks an hour to haul dirt no he'll probably be here for a hour hour and a half maybe they're moving and shaking man I like it I like it when people work hard William or Wild Bill we're gonna call him he's always moving on his feet really fast and he's thinking really good so a good guy to have around on the farm it's hard to find good farm helping people that want to get outside and work nowadays it's really it's just tough so I'm glad I have him very blessed very very blessed and he's a member of law enforcement too so I know I can trust him [Music] [Applause] [Music] well folks here we are on day three