Backfill and Stabilize the Culvert
9:55
27:37
23.2K views
At 9:55 in
Stuck in the mud...Farm job gone wrong
What happens here
After successfully placing the culvert pipe, the operator begins to backfill the gully by pushing dirt and mud from the edges and nearby piles onto and around the pipe. This secures the pipe in its position and starts to form the embankment for the new road. The material is wet and heavy, making the backfilling process slow and challenging, especially when trying to maintain traction with the skid steer.
Goal: Cover the culvert pipe and create the base of the new road.
Tools and materials
- Bucket Attachment DirtDog — Collecting and depositing dirt
- Gehl RT210 — Moving and spreading backfill material