Transport and Deposit Clean Stone
0:13
0:47
3.3K views
At 0:13 in
Stone never touches dirt
What happens here
After the stone is thoroughly cleaned, maneuver the excavator to the desired placement location. In this context, it is a prepared trench lined with geotextile fabric, intended to serve as a stable base layer for construction (such as a retaining wall, as suggested by the stacked stones and vibratory plate compactor nearby). Carefully tilt the excavator bucket to slowly and evenly deposit the clean crushed stone into the trench, distributing it as required for the base layer. Repeat the entire scooping, washing, and depositing cycle until the trench is filled to the desired level.
Goal: Place clean stone into the designated area as a base layer.
Tools and materials
- Excavator Bucket Engcon — Releasing the clean crushed stone into the trench
- Excavator New Holland — Transporting and depositing the clean stone
- Vibratory Plate Compactor — Compacting the stone layer after deposition (not shown in use during this specific action)
- Clean Crushed Stone/Gravel — Creating a stable base layer in the trench
- Geotextile Fabric — Lining the trench to separate the stone from the soil and aid drainage