Skip to main content

Adjust Top Rail Plan and Trim Deck Edge

14:22
30:17
124.9K views

At 14:22 in

Start-to-Finish 3 day DIY Floating deck - BIG REVEAL!

What happens here

Due to insufficient lengths of barge channel rope for the entire deck railing, the plan is to use composite decking for the top rail. However, the composite material is too flexible to be a standalone top rail. To address this, the plan changes to use 2x4s as supports beneath the composite top rail. First, chalk a straight line along the edge of the deck. However, rain washes away the chalk line, so a level is then used as a straight edge to guide the circular saw for trimming the overhanging decking boards. This process creates a clean, straight edge for the top rail installation.

Goal: Prepare the deck edge for the top rail installation after changing material plans.

Tools and materials

  • Circular Saw SKIL — Trimming the overhanging decking boards
  • Level Stanley FatMax — Acting as a straight edge guide for cutting
  • Composite Decking Boards MoistureShield — The material being trimmed

What they say

Hide

our plan was to use a chalk line to create a straight edge to cut all the tails off from the deck but then it started to rain and washed our marks away so instead frankie gets a little creative with the level we don't have a top rail for this deck and so we've got to get a little bit creative okay i'm still not sold on this idea of what we're going to do for a top rail it's got to wrap all the way around it i want to show you a handrail that i made that frankie and i made a while back and we're going to scout and see if we can duplicate it so everyone thought i was crazy when i wanted to do this but you see this it's live edge i found this in the woods let me show you what it looks like this is i think this is amazing looking wood and you know it would be more maintenance but if i can find that wood that would make an amazing but i would need a lot of it let's go in

Auto-generated from the video audio.