Adjust Top Rail Plan and Trim Deck Edge
At 14:22 in
Start-to-Finish 3 day DIY Floating deck - BIG REVEAL!
What happens here
Due to insufficient lengths of barge channel rope for the entire deck railing, the plan is to use composite decking for the top rail. However, the composite material is too flexible to be a standalone top rail. To address this, the plan changes to use 2x4s as supports beneath the composite top rail. First, chalk a straight line along the edge of the deck. However, rain washes away the chalk line, so a level is then used as a straight edge to guide the circular saw for trimming the overhanging decking boards. This process creates a clean, straight edge for the top rail installation.
Goal: Prepare the deck edge for the top rail installation after changing material plans.
Tools and materials
- Circular Saw SKIL — Trimming the overhanging decking boards
- Level Stanley FatMax — Acting as a straight edge guide for cutting
- Composite Decking Boards MoistureShield — The material being trimmed
What they say
(878 characters)Hide
What they say
(878 characters)Auto-generated from the video audio.