Skip to main content

Prepare Subfloor and Apply Adhesive

0:00
0:25
955 views

At 0:00 in

Starting to look like an office!!

What happens here

Begin by thoroughly cleaning the subfloor to ensure it is free of dust, debris, and grease, which can impede adhesive performance. Once clean, apply a specialized flooring adhesive or primer evenly across a section of the subfloor using a long-handled roller. The adhesive appears light blue in the video. According to the narrator, this adhesive should be allowed to sit for approximately 5 to 10 minutes to become tacky before the flooring planks are laid. This tackiness is crucial for a strong bond. Ensure even coverage to prevent areas of weak adhesion.

Goal: Create a clean, primed, and tacky surface for flooring installation

Tools and materials

  • Cleaning Supplies — To clean the subfloor before adhesive application
  • Flooring Adhesive/Primer — To bond the luxury vinyl planks to the subfloor
  • Long-handled Roller — To evenly apply the adhesive across the subfloor
  • Paint Tray — To hold the adhesive for easy loading onto the roller
  • Subfloor — The base surface onto which the flooring is installed